Drilling the Initial 3 Meters
US$45.00
This money goes towards drilling the first 3 meters of the borehole, developed using 10-inch materials to align the machinery and ground conditions.
Quantity:
This money goes towards drilling the first 3 meters of the borehole, developed using 10-inch materials to align the machinery and ground conditions.
This money goes towards drilling the first 3 meters of the borehole, developed using 10-inch materials to align the machinery and ground conditions.